Diamond Grind area to remove contaminants and prepare concrete for coatings.
Vacuum thoroughly to remove dirt and dust from the area.
Apply 100% solids epoxy prime coat (pigmented) to area, and distribute it with a squeegee.
Allow epoxy prime coat to tack over.
Apply 100% solids epoxy build coat (pigmented) to area, and smooth the epoxy using a long-handled paint roller.